Specifications | ||
Capacity | 10,20,50,75,100,150kN | |
Rated output | 2.0±10%mV/V | |
Zero balance | ±0.05mV/V | |
Non-linearity | 0.05%F.S. | |
Hysteresis | 0.2%F.S. | |
Repeatability | 0.2%F.S. | |
Creep(30min) | 0.2%F.S. | |
Temp.effect on output | 0.05%F.S./10℃ | |
Temp.effect on zero | 0.05%F.S./10℃ | |
Input impedance | 380±20Ω | |
Output impedance | 350±10Ω | |
Insulation | ≥5000MΩ/100VDC | |
Recommended excitation | 5~15V | |
Maximum excitation | 20V | |
Compensated temp range | -10~60℃ | |
Operation temp range | -20~80℃ | |
Safe overload | 200%F.S. | |
Ultimate overload | 300%F.S. | |
Cable size | φ2/φ3×4000mm | |
Material | stainless steel | |
Weight approx. | 0.1kg |
- Load Direction -
- Wiring Code -
New Product
Compression Force Sensors
Tension & Compression
Force Sensors
Multi-axis Force Sensors
Piezoelectric Sensors
Weighing Load Cells
Weighing Modules
Torque Force Sensors
Amplifiers, AD Modules & Indicators
The Force sensor group Right has been developing, producing and selling high-precision quality sensors in standard and
application-specific customized designs for 20 years. As an OEM, we also supply well-known suppliers worldwide.
Our product range includes weighing load cells, compression, tension, torque,bolt preload, multi-axis force sensors, signal
amplifiers, indicators & AD Modules.
Fast Prototyping and Professional Technical Support are also part of our competence.
We are also able to supply individually sensors in medium and large quantities,at anytime on the basis of our wide range of standard series.
With development and production located in Changzhou City, Jiangsu Province in China, we guarantee our customers high flexibility and reliability in covering their specific requirements.
Our specialists will be happy to assist you using the contact details below.
Contact your technical sales department and we will find a solution for your special needs.
Q1. What are your terms of packing?
A: Generally, we pack our goods in bulks or wooden box, suitable for shipping container.
Q2. What is your terms of payment?
A: T / T 30% as deposit, and 70% before delivery.
We'll show you the photos of the products and packages before you pay the balance.
Q3. What are your terms of delivery?
A: EXW, FOB, CFR, CIF.
Q4. How about your delivery time?
A: Generally, it will take 10 to 15 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery.
Q8: How do you make our business long-term and good relationship?
A1: We keep excellent quality, thoughtful after-sales service and competitive price to ensure our customers' benefit;
A2: We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.
Contact Person : | Jessy |
---|